This
panoramic view of the National Research and Training Institute for the
Blind construction site was taken on May 1, 2002. About 50 percent of
the two parking levels are visible, and the third level is well started.
The large track crane at the center of the picture will soon be withdrawn
through the remaining gap in the foundation perimeter wall that can be
seen at the left edge of the picture. The pools of rain water with planks
stretched across them are actually the three elevator shafts, which have
been sunk even deeper than the foundation.