This

panoramic view of the National Research and Training Institute for the

Blind construction site was taken on May 1, 2002. About 50 percent of

the two parking levels are visible, and the third level is well started.

The large track crane at the center of the picture will soon be withdrawn

through the remaining gap in the foundation perimeter wall that can be

seen at the left edge of the picture. The pools of rain water with planks

stretched across them are actually the three elevator shafts, which have

been sunk even deeper than the foundation.